Automated Root-Pass Deposition for V-Groove Pipe Joints

Challenge

A controlled root-pass welding application for pipe sections with a 3 mm root opening, demanding consistent penetration, deposition and heat-input control.

The Solution

The solution combined Orion AVC, Linear Oscillation and Wire Feeder controls with precision linear ball-screw slides and intelligent rotation-synchronized weaving. A dedicated Programmable Open-Root Gap Compensation function maintained controlled torch stand-off across the open root, intelligently preventing torch penetration into the root opening while preserving the benefits of AVC control as the torch approached the groove end walls. To give a strong weld especially at the ends, a special add-on program was developed to have a synchronization between AVC and Oscillation too, so as to get a parabolic motion of the TIG torch as it goes end-to-end inside a V-groove joint, especially at the root. This enabled stable and repeatable root deposition despite the open joint condition.

Result & Customer-Reported Outcomes
  • Defect reduction : customer reported significant reduction in weld defects.
  • Throughput increase : customer reported improved production throughput.
  • Optimum heat input : accurate parameter setting enabled repeatable process conditions.
  • Leakage-free root deposition : successful RT was reported, confirming acceptable root-run integrity.